Donation and expense report for the project
Since 2024, we’ve been supporting Zaporizhzhia School No. 77 — helping not only to keep it running during the war, but also to create a comfortable environment for students, preschoolers, and staff. In times of air raids, the school also serves as the primary shelter for the entire neighborhood.
When we first got involved, the war had already been going on for more than two and a half years. Several basement classrooms were functioning in a hybrid format, combining online and in-person learning. Two rooms had been adapted for short-term preschool care. And the only shelter for local residents was a bare-bones space in a former boiler room.
Our support began with fuel for generators and other basic energy needs. We also installed doors between rooms in the shelter to reduce distractions during lessons.
Thanks to the support of Fieramente Srl (Italy) and other donors, we purchased materials for repairs. As a result, part of the previously unused basement was transformed into a new, comfortable preschool space — complete with a sleeping area, playroom, and even an interactive whiteboard.
But the space still wasn’t enough. So in spring 2025, together with the Ukrainian company Involve and several anonymous donors, we launched a large-scale reconstruction of the former boiler room. The work was extensive: new floors, walls, ceilings, openings between rooms, and even a porch with a ramp. And the cherry on top? Dozens of meters of old piping — some dismantled, others replaced and rerouted.
In just two months, we spent over $50,000 USD on reconstruction. Unexpectedly, we also had to renovate the kitchen, and after a drone attack — the bathroom as well. The pace of work is impressive, and we can already envision the final result. But the costs are rising and have exceeded our initial estimates — and there’s still a long way to go.
That’s why we’re asking for your support.
Together, we can build a safe and welcoming environment for children — allowing their parents to focus on work, strengthening the local community, and bringing us all closer to victory.
# | Date: ⇅ | Name: ⇅ | Sum: ⇅ |
---|---|---|---|
1 | 13.10.2025 | NOVA POShTA (Ukraine) | $144.22 |
2 | 03.10.2025 | Special project Involve (transfer) | $4603.11 |
3 | 24.09.2025 | Special project Involve (transfer) | $127.86 |
4 | 22.09.2025 | Special project Involve (transfer) | $497.36 |
5 | 22.09.2025 | Special project Involve (transfer) | $2201.59 |
6 | 22.09.2025 | Special project Involve (transfer) | $46.07 |
7 | 19.09.2025 | Special project Involve (transfer) | $1708.84 |
8 | 18.09.2025 | Special project Involve (transfer) | $49.3 |
9 | 04.09.2025 | Special project Involve (transfer) | $469.09 |
10 | 22.08.2025 | Charitable donation (transfer) | $4701.82 |
11 | 22.08.2025 | Charitable donation (transfer) | $129.8 |
12 | 21.08.2025 | Charitable donation (transfer) | $187.44 |
13 | 21.08.2025 | Charitable donation (transfer) | $6.77 |
14 | 08.08.2025 | Charitable donation (transfer) | $2836.93 |
15 | 07.08.2025 | Charitable donation (transfer) | $159.33 |
16 | 07.08.2025 | Charitable donation (transfer) | $66.43 |
17 | 06.08.2025 | Charitable donation (transfer) | $250.45 |
18 | 06.08.2025 | Charitable donation (transfer) | $492.23 |
19 | 05.08.2025 | Charitable donation (transfer) | $19.14 |
20 | 04.08.2025 | Charitable donation (transfer) | $51.93 |
21 | 01.08.2025 | Anonymous donor (Ukraine) | $0.24 |
22 | 01.08.2025 | Charitable donation (transfer) | $277.3 |
23 | 01.08.2025 | Charitable donation (transfer) | $5334.91 |
24 | 25.07.2025 | Charitable donation (transfer) | $263.67 |
25 | 25.07.2025 | Charitable donation (transfer) | $989.29 |
26 | 24.07.2025 | Charitable donation (transfer) | $3678.75 |
27 | 24.07.2025 | Charitable donation (transfer) | $543.84 |
28 | 22.07.2025 | Charitable donation (transfer) | $5.7 |
29 | 18.07.2025 | Charitable donation (transfer) | $7525.1 |
30 | 17.07.2025 | Charitable donation (transfer) | $533.38 |
31 | 17.07.2025 | Charitable donation (transfer) | $2574.23 |
32 | 15.07.2025 | Charitable donation (transfer) | $162.74 |
33 | 11.07.2025 | Charitable donation (transfer) | $61.13 |
34 | 11.07.2025 | Charitable donation (transfer) | $1624.54 |
35 | 10.07.2025 | Charitable donation (transfer) | $1234.12 |
36 | 07.07.2025 | Charitable donation (transfer) | $601.38 |
37 | 04.07.2025 | Charitable donation (transfer) | $6015.43 |
38 | 04.07.2025 | Charitable donation (transfer) | $717.98 |
39 | 04.07.2025 | Charitable donation (transfer) | $317.64 |
40 | 03.07.2025 | Charitable donation (transfer) | $851.11 |
41 | 27.06.2025 | Charitable donation (transfer) | $1565.31 |
42 | 25.06.2025 | Charitable donation (transfer) | $1614.63 |
43 | 25.06.2025 | Charitable donation (transfer) | $3230.68 |
44 | 17.06.2025 | Charitable donation (transfer) | $347.88 |
45 | 16.06.2025 | Charitable donation (transfer) | $1947.74 |
46 | 16.06.2025 | Charitable donation (transfer) | $180.49 |
47 | 12.06.2025 | Special project Involve (transfer) | $2775.7 |
48 | 12.06.2025 | Charitable donation (transfer) | $1099.8 |
49 | 12.06.2025 | Charitable donation (transfer) | $3923.62 |
50 | 02.06.2025 | Special project Involve (transfer) | $4748.23 |
51 | 27.05.2025 | Special project Involve (transfer) | $157.65 |
52 | 22.05.2025 | Special project Involve (transfer) | $843.06 |
53 | 24.03.2025 | Charitable donation (transfer) | $311.19 |
54 | 04.02.2025 | Special project ALLIANCE (transfer) | $121.35 |
55 | 05.12.2024 | Special project Involve (transfer) | $268.28 |
56 | 28.11.2024 | Special project S.O.S. (transfer) | $345.53 |
57 | 26.11.2024 | FIERAMENTE SRL (Italy) | $1037.68 |
58 | 09.10.2024 | Special project Involve (transfer) | $159.65 |
59 | 04.10.2024 | Special project Involve (transfer) | $612.95 |
# | Date: | Expenses: | Sum: |
---|---|---|---|
1 | 13.10.2025 | Free delivery: supply and exhaust unit with heat recovery - 2 pcs. (partially) | $144.22 |
2 | 03.10.2025 | Supply and exhaust unit with heat recovery - 2 pcs. | $4603.11 |
3 | 24.09.2025 | Drain pipe 3m - 2pcs; Pipe elbow 6pcs; Brackets 16pcs; Branch pipe 2pcs; Polyurethane sealant 300ml 2pcs. | $127.86 |
4 | 22.09.2025 | Modified bunk bed (double) - 29 pcs; Modified bed (single) - 1 pcs. | $2201.59 |
5 | 22.09.2025 | Beton-Kontakt 1.4 kg - 1 pc; Cement SEM II/B-S 32.5 N container 25 kg EU - 10 pcs. | $46.07 |
6 | 22.09.2025 | Rubber paint SuperElastik 12 kg - 4 pcs; Profiled sheet PR-15A 0.45mm 2*1.155m - 7 pcs; LED spotlight 6 pcs. | $497.36 |
7 | 19.09.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR (Current Repair of Premises) facility | $1708.84 |
8 | 18.09.2025 | Casting 160 (250) 9003 0.4 mm - 14 pcs. | $49.3 |
9 | 04.09.2025 | Building materials: PVC pipe for internal sewage, Push-button drain valve, Kitchen faucet, Internal corner, Bathtub faucet) | $469.09 |
10 | 22.08.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR (Current Repair of Premises) facility | $4701.82 |
11 | 22.08.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR (Current Repair of Premises) facility | $129.8 |
12 | 21.08.2025 | Delivery of building materials | $6.77 |
13 | 21.08.2025 | IKS-TECH; Galvanized plaster lath 30 pcs; Perforated and drawn mesh 80 m2; Deep penetrating primer 2 pcs; Facade finish putty 5 pcs; Adhesive mixture for ceramic tiles; Fabric-backed sandpaper 3 sq. M | $187.44 |
14 | 08.08.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR facility (current repairs of premises) | $2836.93 |
15 | 07.08.2025 | Building materials: Tees, angles, dowels, brackets, washbasin mounts, etc. | $66.43 |
16 | 07.08.2025 | Heating; Sewage; Ball valves; Fasteners; Couplings; Pipes; Sealant, etc. | $159.33 |
17 | 06.08.2025 | Delivery at the rate of 1 km. | $250.45 |
18 | 06.08.2025 | LED lamp 14 pcs; Circuit breaker 19 pcs; Terminal block 5 pcs-12 pack; Cable channel 2 m - 2 pcs; ARMOSTEEL profile 0.5 mm 58 pcs; Skirting board 18*56*2500 mm 34 pcs; Board min. Breeds 3 m 9 pcs; Ceresit primer 10 l; Plug, gutter holder… | $492.23 |
19 | 05.08.2025 | Paint D100 7 kg Latex Matte | $19.14 |
20 | 04.08.2025 | 0.4mm strip - 12 pcs. | $52.17 |
21 | 01.08.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR facility (current repairs of premises) | $5334.91 |
22 | 01.08.2025 | Paint for concrete coatings 25 kg 3 pcs; Roller 2 pcs; Roller handle 2 pcs; Plastic cuvette 2 pcs; White spirit 4 l - 3 pcs. | $277.3 |
23 | 25.07.2025 | Ball valve; Coupling; Polypropylene pipe 4m; Flange 4pcs; Steel reducer 5pcs; Steel pipe 2m; Steel clamp with screw 43pcs. | $263.67 |
24 | 25.07.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR facility (current repairs of premises) | $989.29 |
25 | 24.07.2025 | Ceiling skirting board 20pcs; Metal tile 2pcs; Drywall 3m2-20pcs; Gypsum glue 25 kg 5pcs; Tile glue 25kg 10pcs; Diamond disc; Pigment; Impact dowel; Aluminum profile/tile external angle 16pcs; Self-tapping screw for drywall on metal | $543.84 |
26 | 24.07.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR facility (current repairs of premises) | $3678.75 |
27 | 22.07.2025 | Straight angle 2.5 m - 15 pcs. | $5.7 |
28 | 18.07.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR facility (current repairs of premises) | $7525.1 |
29 | 17.07.2025 | Siloxane-modified paint 10l 2pcs; Acrylic primer 10l 2pcs; Vinyl wallpaper on fleece. 8pcs; Glue; Colorant; Pigment; Ceresit primer 10l 3pcs; Self-tapping screw; Dowel; Suspension 10pcs -20pack; Plug; Coupling; Sewer pipe | $533.38 |
30 | 17.07.2025 | Metal-plastic structures - 15 pcs. | $2574.22 |
31 | 15.07.2025 | River sand - 10 tons, cargo transportation in Zaporizhia | $162.74 |
32 | 11.07.2025 | Building materials: Cement 25kg 22pcs; Reinforced cement screed 25kg 10pcs; Profile 0.5mm 12pcs; Crushed stone 40kg 20pcs; Tile 88.143 m2; Washbasin 2pcs; Kitchen faucet 2pcs; Toilet; Min. processed board 12pcs; Primer 4 Enamel; Self-tapping screws, etc. | $1624.54 |
33 | 11.07.2025 | PP tee 4pcs; PP angle 8pcs; Internal sewer pipe 10pcs/pack; Polypropylene plug with air valve 50 d/sewer pipe 4pcs; Ball valve 10pcs; Coupling 11pcs; Plug 5pcs; Elbow 15pcs. | $61.13 |
34 | 10.07.2025 | Building materials: Ball valve 10 pcs; Reducing tee 13 pcs; Coupling 19 pcs; Elbow 34 pcs; Polypropylene pipe 64 m; Fiberglass pipe 32 m; Metal branch 4 pcs; Flange ball valve. 2 pcs; Clamp 80 pcs; Anchor collet 100 pcs. | $1234.12 |
35 | 07.07.2025 | Concrete Standard C25/30 - 5 m3; delivery | $601.38 |
36 | 04.07.2025 | Drain Brukland 320x160.70.gray - 90pcs; Cement CEM II/ B-S 32.5 N container 25kg EU 20pcs; Rectangular construction container 80l. 790 x 485 x 300 HAISSER | $317.64 |
37 | 04.07.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR facility (current repairs of premises) | $6015.42 |
38 | 04.07.2025 | Sand 40 kg -100 pcs; Profile CD-60/steel 0.50/L=3m-100 pcs; Profile UD-27/steel 0.50/L=3m-162 pcs; Suspension univ.250 0.9mm 200 pcs; Angle perfor.3m and 2.5 m -72 pcs; Dowel nail (100 pcs/pack)-2200 pcs; Self-tapping screw 3000 pcs; Screw 2000 pcs. | $717.98 |
39 | 03.07.2025 | KNAUF drywall 3m2-50pcs; Gypsum putty 25kg-11pcs; Busbar joint. 5 pcs; Circuit breaker 10 pcs; Corrugated pipe; Zero busbar; Concrete drill 2pcs; Non-woven tape, 4pcs. | $851.11 |
40 | 27.06.2025 | Sand 40kg -50pcs; Cement 25kg-15pcs; Profile 18pcs; Bitumen-rubber mastic 18kg-2pcs; Gypsum glue 25kg-10pcs; Drill; Abrasive mesh; Knife; Spatula; Dowel; Self-tapping screw; Abrasive circle; Profile pipe 2m-60pcs; Office lamp 26pcs for other. | $1565.31 |
41 | 25.06.2025 | Payment for construction work performed on the Zaporizhzhia Gymnasium No. 77 ZMR facility (current repairs of the Shelter premises) | $3230.69 |
42 | 25.06.2025 | Payment for completed construction work on the Zaporizhia Gymnasium No. 77 ZMR facility (current repairs of premises) | $1614.63 |
43 | 17.06.2025 | Building materials: Cement 25 kg - 30 pcs; Sand 40 kg - 50 pcs; Masonry mesh 100*100*2.5 - 75 pcs. | $347.88 |
44 | 16.06.2025 | Crushed stone - 10 tons; Delivery | $180.49 |
45 | 16.06.2025 | Concrete Standard C25/30 - 20 m3 | $1947.74 |
46 | 12.06.2025 | OSB-3 slab 5 pcs; Aerated concrete block 150 pcs; Tile 156.6 m2; Compact toilet 7 pcs; LED shower 10 pcs; Washbasin 4 pcs; Pedestal 4 pcs; Electric water heater; Gypsum putty 25 kg -44 pcs; Latex paint 10 l 16 pcs; Floor mixture 25 kg 100 pcs. | $6699.32 |
47 | 12.06.2025 | Door block 4 pcs; Metal tile 2,655 sq.m 9 pcs; Plastobit 10 sq.m -5 rolls; Metal entrance doors; MDF skirting boards 2200*70mm 20 pcs. | $1099.81 |
48 | 02.06.2025 | Building materials: Drywall 3m2 - 150pcs; Profile 285pcs; Plaster 60pcs; Primer 10l -10pcs; Latex paint 10l - 15pcs; Cable 100m; Wire 400m; Corrugated tube 50m 10pack; Socket 25pcs; Switch 10pcs; Cable tie; Lamp 36pcs; Lamp 36pcs. | $4748.24 |
49 | 27.05.2025 | Building materials: Sand 40kg - 12 pcs; Gypsum glue 25kg; Ultracolor Plus Mapei grout 5kg - 2 pcs; Pipe 5 pcs; Reducing tee 4 pcs; Mounting angle 4 pcs; Coupling 18 pcs; 90° angle 12 pcs; Aluminum profile/facing 6 pcs. | $157.65 |
50 | 22.05.2025 | Building materials: Drywall - 13 pcs; Sand 40kg - 9 pcs; Profile - 38 pcs; Cement 25kg - 3 pcs; Self-tapping screw; Screw; Dowel; Silicone primer 10l; Gypsum glue 25kg; Cement-reinforced screed 25kg; Glue/tiles 25kg - 11 pcs; Tiles 49.74 m2 | $942.98 |
51 | 14.02.2025 | Interactive whiteboard UT-TB182S | $553.88 |
52 | 04.02.2025 | Doors 5 pcs. (partial payment) | $179.47 |
53 | 04.02.2025 | Doors 5 pcs. (partial payment) | $239.29 |
54 | 11.01.2025 | Compact toilet; Washbasin for temporary shelter | $77.43 |
55 | 05.12.2024 | Gasoline A-95 - 200 l | $268.78 |
56 | 28.11.2024 | Plaster 30kg - 10 pcs; Putty 25kg-10 pcs; Paint 14kg-5 pcs; Primer 10l-2 pcs; Drywall 3.6m2-15 pcs; Profile 32 pcs; Aerated concrete 100 pcs; Cement 25kg-3 mesh. | $656.17 |
57 | 09.10.2024 | 2E fuel canister 20 l - 2 pcs.; YUKO semi-synthetic engine oil 10W-30 5 l - 2 pcs.; Multi-core power cable UP! PVS 3x2.5 - 60 m | $159.65 |
58 | 04.10.2024 | Diesel fuel for the generator - 500 l. | $612.95 |